Pardon Our Dust: BLC Remodeling Projects

Beginning Winter Break, a number of BLC rooms will be remodeled:

29 Dwinelle: This room will be converted into a small seminar-style classroom, with distance-learning capability, with seating for 10. This project will take place in January, 2013.

B-7 Dwinelle: The moldy carpet (due to frequent water leaks from the equipment room next door) will be replaced with linoleum flooring. This project will be completed during the week of Dec. 17th.

33 Dwinelle: The 15-year-old carpeting will be replaced with linoleum flooring. This project will be completed during the week of Dec. 17th.

B-37 Dwinelle: This room (currently the BLC library), as well as the four cubicles just outside the room, will be converted into a DL-capable classroom seating up to 30. The library books will be moved to the Claire Kramsch lounge in 34 Dwinelle.

Categories

Tags